 |
|
|
|
 |
 |
 |
|
Quality Japanese Koi & Unique Affordable Pond Construction
|
 |
Services
|
 |
Your pool arrives in kit form with simple instructions and
assembly will take from just a few minutes to perhaps an hour depending on model.
Whilst ground preparation is not essential it is advisable to ensure as level
a site as possible.
 |
 |
Interlocking
framework of
the Midi, Tati, Teya and Koya |
Feeding
the crossbar into the sleeve |
|
|
Detail of the
Flipper, Nerea
and Max Ranges framework support |
Corner coupling of the Max Range |
|
|
Lowering
the crossbar into the vertical framework |
Corner coupling
& crossbar linkage for the Nerea Range
|
|
|
Framework detail of the
Max Range
|
Assembling
the framework |
|
|
 |
|
 |
|
| |
|
©2003-2006
The Nishikigoi Centre •
Conditions of Use •
Copyright • Privacy Policy |